Search results
307 results ordered by
The Week That Was – 20 August 2021
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreThe Building Safety Bill – a welcome change?
Following the Grenfell tragedy on 14 June 2017, the Government appointed Dame Judith Hackitt, former Chair of the HSE, to undertake an independent review of building safety in high-rise buildings. Dame Judith commented that the current system is "far too complex" and "lacks clarity as to who is responsible for what" with "inadequate oversight and enforcement". She wanted her recommendations to form the foundation of a clearer, simpler and more robust approach to the building and management of high-rise residential buildings. Her report was published in May 2018.
Read moreThe Week That Was – 13 August 2021
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreFire Safety Act 2021: Clarification for the Responsible Person
The Fire Safety Bill (the "Bill") received Royal Assent on 29 April 2021 and is now known as the Fire Safety Act 2021 (the "Act"). Although the date has not yet been confirmed for when the Act comes into force, this is another significant development on the issue of fire safety.
Read moreThe Week That Was – 6 August 2021
Pursuant to a building contract novated to Toppan, Simply was engaged to construct a care home and subsequently provided a collateral warranty in favour or the operator, Abbey. Defects were found at the care home and Abbey obtained an adjudicator's decision against Simply for damages for loss of trading profit.
Read moreArchitect receives 12 month suspension over "ugly duckling" home cinema design
Daniel Marcal, an internationally renowned and award winning architect, was retained by Phillip Freeborn, former head of operations at Barclays Capital and his wife Christina Goldie to design an "architectural jewel" of a home cinema, in their £7 million London home. However, as Mr Freeborn told the High Court in his claim against Mr Marcal, he ended up with a "wonky" "expensive white elephant", rather than the sleek modernist cube floating over his pool that he had wanted.
Read moreThe Week That Was - 30 July 2021
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreThe Week That Was - 23 July 2021
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreKnot so Weedy Afterall? RICS issues new draft guidance on Japanese Knotweed
The RICS is seeking consultation on its Japanese Knotweed draft guidance note. The consultation, which you can access here, opened on 22 June 2021 and closes on 3 August 2021.
Read moreDisciplinary investigations against architects #6 - Professional Conduct Committee Hearing: What to expect
Further to our previous five articles detailing the stages of the Architect Registration Board's (ARB) disciplinary process up to the Referral to Professional Conduct Committee stage, this article considers the Professional Conduct Committee Hearing, and what Architects should expect if their case reaches this stage.
Read moreNew RICS Guidance for Risks, Liability and Insurance April 2021
The RICS have produced a new Guidance Note entitled "Risks, Liability and Insurance", which came into effect on 1 April 2021. This note is a must read for surveyors and provides practical advice for risk management and the points to consider when seeking professional indemnity cover.
Read moreFire safety – at last, some welcome news for surveyors
We set out below news of a welcome change to the professional indemnity insurance available to surveyors relating to their fire safety work.
Read moreThe RICS key to unlock the market?
In December 2019, the RICS launched a new form, the EWS1, to assist with the process of valuing properties within all residential buildings over six storeys (18 metres). In the wake of the Grenfell Tower tragedy, lenders were needing to understand whether materials used for cladding/insulation were safe and would require remediation at a cost that would have impact on the value of the property. The EWS1 form was intended to provide a quick route to ascertain whether works were required that might have an impact on value.
Read moreDisciplinary investigations against architects #5 - Referral to Professional Conduct Committee
Further to our previous four articles detailing the stages of the Architect Registration Board's disciplinary process up to the Investigations Panel Stage, this article considers the steps that are taken by the ARB in order to refer the matter to the Professional Conduct Committee and the steps that an Architect may wish to take to prepare for that hearing.
Read moreThe Week That Was - 27th November 2020
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreThe Week That Was - 13 November 2020
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreThe week that was - 30th October 2020
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreThe Week That Was - 23rd October 2020
Welcome to The Week That Was, a round-up of key events in the construction sector over the last seven days.
Read moreBuilding on renewable energy #3 – Anaerobic Digestion
Anaerobic digestion is the process by which biodegradable materials are broken down in a controlled environment. Whilst being broken down, the materials emit gas (which can be used as a source of renewable energy), and produce heat (which can also be harnessed on or near-to site). The process also leaves a waste material (digestate), which can be used as fertiliser, contributing to the circular economy.
Read moreCLC issue new Guidance on dispute resolution in the construction industry
COVID-19 continues to cause significant disruption and delay to the construction industry. Whilst things are slowly returning to normal and construction sites are resuming work, there are concerns that the effect of the pandemic on projects may result in long-running and costly disputes arising. Accordingly, the Construction Leadership Council (CLC) have issued guidance in an effort to promote a more pragmatic approach to dispute resolution.
Read moreHart v Large: Important guidance for surveyors when advising prospective purchasers
The judgment in Hart v Large provides important guidance on the scope of a surveyor's duty when advising prospective purchasers. It also highlights that the courts may be willing to depart from the usual measures of loss, in order to achieve what they consider to be a fair outcome.
Read moreHealth and Safety Bulletin – June 2020
Welcome to the latest edition of our Health and Safety update.
Read moreLockdown inspections: Guidance from the RICS
The RICS has issued two sets of guidance to its members focusing on physical inspections. The guidance builds on the most recent government advice regarding appropriate conduct and the timetable for lifting restrictions.
Read moreImpact of COVID-19 on telecommunications apparatus
With COVID 19 keeping individuals and businesses in various states of lockdown around the world, the importance of telecommunications in keeping the country connected, both professionally and socially, has been thrown into sharp relief.
Read moreLease frustration and COVID-19
Frustration of a contract occurs due to a supervening event meaning the contract is no longer capable of performance. If frustration is found to have occurred, the contract is automatically terminated.
Read moreDisciplinary investigations against architects #4 - investigations panel stage
Further to our previous three articles which provided (1) an overview of the Architect Registration Board's disciplinary process and (2) a review of the complaints stage (3) the review stage, this article explains the next stage of a disciplinary investigation against an Architect: the investigations panel stage.
Read moreCould I mitigate my losses by using my premises for other purposes?
With the inevitable impact of the coronavirus on retail businesses, many will be looking to mitigate their losses. One obvious way of doing this would be to use their premises, often their single largest overhead, for other uses. But is this possible and what must you consider?
Read moreBuilding on renewable energy #2 - Wind power
Wind power is, unsurprisingly, generated by wind (typically as little as a light breeze) passing over and turning the turbine's blades. The blades are connected via a shaft and gearbox to a generator, which converts the kinetic energy into electrical energy. A transformer then increases the voltage of the generated energy to enable transmission to the grid.
Read moreDisciplinary investigations against architects #3 – The review stage
Further to our previous two articles which provided (1) an overview of the Architect Registration Board's disciplinary process and (2) a review of the complaints stage we explain the next stage of a disciplinary investigation against an Architect, the review stage.
Read moreDisciplinary investigations against architects #2 - Complaints to the ARB
Further to our previous article which provided an overview of the Architect Registration Board's disciplinary process, we explain the first stage of a disciplinary investigation against an Architect, the complaint stage.
Read moreGround conditions: An entitlement to additional costs despite accepting risk?
The High Court published a decision late last year which deals with a frequently encountered issue; a claim for additional payment where a sub-contractor encountered adverse ground conditions. The sub-contractor, Clancy Docwra, was engaged by E.ON Energy to excavate trenches in connection with the installation of a district heat network in central London. During the course of the project Clancy Docwra encountered adverse ground conditions (in particular underground brick walls and brick rubble) and the parties were in dispute over what additional entitlement Clancy Docwra had in relation to those works.
Read moreHow long does your collateral warranty last?
The Technology and Construction Court's recent judgment will be of interest to all those in the industry who either provide or receive collateral warranties.
Read moreNetwork Rail to ban retentions and mandate payment periods to subcontractors
Network Rail mandates tier one contractors to abolish cash retentions and pay suppliers within 28 days.
Read moreOral variations can leave you between a Rock and a hard place
Variations to contracts, whether the scope of the works or services to be performed or the terms under which those works/services are provided, are common place in the construction industry. Often these variations are agreed on site, in a hurry and with little regard to any formalities that might be contained within the parties' contract. The recent case of Rock Advertising Limited v MWB Business Exchange Centres Ltd provides an important reminder that the contract shouldn’t be ignored.
Read moreNew(ly reiterated) grounds for stay on enforcement of an adjudication decision
A real risk of the dissipation or disposal of an adjudication sum may justify the grant of a stay on enforcement of an adjudicator's award.
Read moreEquitix ESI CHP (Wrexham) Limited v Bester Generacion UK Limited: Judicial guidance on the applicability of the HGCRA to a dispute under a power generation contract
Equitix ESI CHP (Wrexham) Limited (Equitix), a special purpose vehicle, entered into a design and build contract with Bester Generacion UK Limited (Bester) for the construction of the Wrexham Biomass Fired Energy Generating Plant (the Project).
Read moreIncorrect Ownership Certificates: A Cautionary Tale
In a case which the judge deemed to be "a cautionary tale about how not to submit a planning application and its consequences", the High Court has recently tackled the question of the effect of incorrect ownership certificates submitted with planning applications. In considering the issue, the Court has given us a helpful reminder of when such an error might lead to the quashing of a planning permission.
Read moreFIDIC Rainbow Suite: Second Editions unveiled
18 years after the publication of the original editions, FIDIC released its Second Edition Red (Construction), Yellow (Plant and Design Build) and Silver Books (EPC / Turnkey Projects) at the FIDIC Users' Conference in London last week. The philosophy behind the revised contracts is greater clarity and transparency with an emphasis on avoiding disputes and quickly resolving them when they do arise. We highlight some of the key changes within this note.
Read moreConstruction Act and Retention consultations published by the Government
The Government has recently published two consultations to review (i) the implementation of the 2011 changes to the Construction Act; and (ii) the practice of cash retention under construction contracts.
Read moreFrom light industrial to residential – the new permitted development right
At a time when headlines and inboxes are filled with new comment, consultation and discussion on how to tackle England's housing crisis, a new permitted development right allowing a change of use from light industrial to residential has come into effect with very little fanfare. So what's new, and why have we not heard more about it?
Read moreNorth Midland Building Limited v Cyden Homes Limited [2017] EWHC 2414 (TCC): Choose your extension of time provisions carefully
North Midland Building Limited v Cyden Homes confirms the primacy of the parties' contract in determining an extension of time. Specifically, in North Midland the High Court held that an amendment made to the construction contract meant that, in a situation of concurrent delay, North Midland Building Ltd (the Contractor) was not entitled to an extension of time from Cyden Homes Ltd (the Employer) and that the prevention principle, had it arisen, would not take precedence over the expressly agreed terms of the contract.
Read moreContractors and Insurers beware - Contractor found to bear the risk of an incorrect standard as fitness for purpose prevails in the Supreme Court
This morning the Supreme Court handed down its much anticipated judgment in MT Højgaard A/S v E.ON Climate & Renewables UK Robin Rigg East Limited and another [2017] UKSC 59. The Judgment should be of concern to both contractors and their insurers.
Read moreIs it game over for ground rent?
Considering the recent Government proposals to change the rules on ground rent and how those proposals may affect developers.
Read moreComplex contracts and intricate inconsistencies – a reminder of the court's approach to contractual interpretation
In a year in which the Supreme Court will have produced two Judgments on the topic of contractual interpretation, the TCC's judgment in 125 OBS v Lend Lease is a useful reminder of the courts' approach to resolving these disputes and their attempt to find a balance between the so-called literal and commercial approaches to interpretation.
Read moreEven More Challenging Times – 5 More Risks Following The Grant of Planning Permission
This post is the second in a two-part series in which we highlight ten areas where the risk of a third party challenge against the grant of planning permission might arise. The list we have given is not exhaustive, but all issues fall within the broad parameters for judicial review grounds, being decisions which have been taken irrationality, ultra vires (outside the scope of the authority's powers), or with procedural irregularity.
Read moreEIA – a new role for the planning system in considering the health impacts of development?
A summary of the EIA Regulations 2017 and the consideration as part of the planning application process of a proposed development's likely impacts on human health.
Read moreLet there be light
The importance of light in WELL Building Standards and how it sits within the context of planning law and rights of light
Read moreMIPIM: 10 things we learnt about you
A round up of things we learnt during our first experience of MIPIM week, from what to wear to how to plan your diary and make the most of your new connections
Read moreEngaging with Development – do we always know what we need?
Comment on the need for public engagement in the planning and development process, following a ULI presentation on The Well-Tempered City (author Jonathan Rose)
Read moreStay connected and subscribe to our latest insights and views
Subscribe Here